Current Service Notifications
Announcements and information concerning our services.
State | Date | Description | |
---|---|---|---|
04.09.2023 12:25 | No subscription of QuoVadis mail certificates | Details | |
No subscription of QuoVadis mail certificatesAt the moment, no new mail certificates can be obtained from QuoVadis.
Certificates already obtained and stored in our PKI can still be downloaded.
Machine certificates and TLS/SSL certificates are not affected. |
|||
04.09.2023 07:55 | no access to password.ethz.ch possible | Details | |
no access to password.ethz.ch possibleAt the moment no access to the page password.ethz.ch is possible. After entering the OTP the message HTTP Status 500 - Internal Server Error appears.
We are working hard to correct this. |
|||
01.09.2023 08:58 | SharePoint 2016 Problems with Workflow | Details | |
SharePoint 2016 Problems with WorkflowWe have a problem with the workflow engine of SharePoint 2016, currently no workflows can be started and edited. Additionally, the edit form does not close on lists that have a workflow, but the changes are saved.
Thank you for your understanding. |
|||
30.08.2023 13:46 | Performance problems on the NAS | Details | |
Performance problems on the NASWe are currently experiencing performance issues on NAS12. Several services are probably affected.
A solution is being worked on at full speed. |
Date | Description |
---|
Start | End | Description | |
---|---|---|---|
06.09.2023 08:00 | 06.09.2023 16:00 | Network interruption/ structural maintenance work on Wednesday 06.09.2023 from approx. 08:00-16:00h in the BSS D-F floor | Details |
Network interruption/ structural maintenance work on Wednesday 06.09.2023 from approx. 08:00-16:00h in the BSS D-F floorOn Wednesday 06 September 2023 from about 08:00-16:00 there will be a network interruption as a result of renovation work on the UKV connections on the BSS D-F floor. Affected are all network connections at:
ca. 08:00-10:00: "swi-bss-d20-5-a" "swi-bss-d50-5-a"
ca. 10:00-13:00: "swi-bss-e20-5-a" "swi-bss-e50-5-a"
ca. 13:30-16:00: "swi-bss-f20-5-a" "swi-bss-f50-5-a" |
|||
11.09.2023 09:00 | 19.09.2023 16:15 | Network interruption / installation work on the power grid 11.09.2023, 18.09.2023 (possibly 19.09.2023) on the Alpwiesenstein site | Details |
Network interruption / installation work on the power grid 11.09.2023, 18.09.2023 (possibly 19.09.2023) on the Alpwiesenstein siteThe RhB must replace the underground cable in Preda at the last overhead line mast EWB 1/RhB 64 before the HS-VK Preda. (Switching RhB tunnel)
Since the work on the mast takes place, we must also switch off the voltage for safety reasons.
Because the shutdown lasts several hours in each case Preda- Albula Hospiz is fed as island operation with the KW Preda.
When:
Switching from mains to island operation on Monday 11.09.2023 between 09:00am and 09:15am (interruption) and between 16:00h and 16:15h (interruption) again from island operation to grid operation.
as
Switching from grid to island operation on Monday September 18.2023 between 09:00am and 09:15am (interruption) and between 16:00h and 16:15h (interruption) again from island operation to grid operation.
Switching from grid to island operation on Tuesday 19/09/2023 between 09:00am and 09:15am and between 16:00pm and 16:15pm again from island operation to grid operation. Jokertag if the Monday by the weather would not be feasible.
Affected by this interruption is the entire power network incl. Network, telephony and WLAN in the buildings AWB, AWC, AWD on the Alpwiesenstein |
|||
20.09.2023 07:00 | 20.09.2023 07:30 | Power/network interruption Wednesday 09/20/2023 between approx. 07:00-07:30 in the building CAB floor E,F,G | Details |
Power/network interruption Wednesday 09/20/2023 between approx. 07:00-07:30 in the building CAB floor E,F,GOn Wednesday 20.September 2023, due to technical adjustment work on the main distribution in the building CAB, between ca.07.:00-07:30 a.m., there will be a power interruption.
This interruption will also affect the entire network from the floor switches, swi-cab-e70-4-a (E10.005-E88),swi-cab-f70-4-a (F10.4-F88) and swi-cab-g20-2-a (G11-G39.3), including telephony and WLAN transmitter. |
|||
21.09.2023 01:00 | 21.09.2023 06:00 | Network interruption Thursday, September 21, 2023 from approx. 1:00 a.m. to 6:00 a.m. Location Eschikon / Lindau | Details |
Network interruption Thursday, September 21, 2023 from approx. 1:00 a.m. to 6:00 a.m. Location Eschikon / LindauOn Thursday 21 September 2023, there will be a network interruption due to maintenance work on the fiber optic network from 01:00 - 06:00 at the Eschikon / Lindau site.
Affected by this interruption is the entire network including telephony and WLAN. |
|||
13.09.2023 05:30 | 13.09.2023 12:00 | Integral security tests / data network interruption Wednesday 16.09.2023 approx. 5:30 am - approx. 12:00 pm in the buildings CLA/LEO/TAN | Details |
Integral security tests / data network interruption Wednesday 16.09.2023 approx. 5:30 am - approx. 12:00 pm in the buildings CLA/LEO/TANOn Wednesday 13 September 2023, an integral security test will take place in the CLA/LEO and TAN buildings between 05:30-ca.12:00h.
The total power shutdown will take place between 06:30 and 08:00h.
Affected by this interruption between 06:30 and 08:00 is also the entire network of floor switches, including telephony and WLAN transmitters. |
|||
23.08.2023 07:00 | 23.10.2023 17:00 | Integral safety tests / data network interruption Wednesday 23.08.2023 approx. 07:00-approx. 17:00 h in the HPM building | Details |
Integral safety tests / data network interruption Wednesday 23.08.2023 approx. 07:00-approx. 17:00 h in the HPM buildingOn Wednesday 23 August 2023, an integral test will take place in the HPM building between 07:00 - 17:00.
Affected by this interruption are all network connections at the floor switch swi-hpm-a81-3-a. |
|||
08.09.2023 20:00 | 08.09.2023 23:00 | Zone Router HG Hardware Lifecycle | Details |
Zone Router HG Hardware LifecycleAs part of the lifecycle, on September 8, the hardware will be replaced from the router HG.
When: on 8.9.2023 between 20:00 and 23:00
What is affected: The entire data network of the network zone HG, including wifi etc. |
|||
06.09.2023 06:00 | 06.09.2023 07:00 | Renewal of RADIUS Certificate 06.09.2023 | Details |
Renewal of RADIUS Certificate 06.09.2023On Wednesday, September 6, 2023 the RADIUS certificate which allows a secure log on to the ETH network (802.1x) will be renewed. Users will be asked to trust it on their first connect. The domain used in the certificate is radius-service.ethz.ch, issued by DigiCert (instead of Sectigo/USERTrust as before) |
|||
04.07.2023 18:00 | 04.09.2023 21:00 | polybox update – July 4th 2023 at 6pm -11pm | Details |
polybox update – July 4th 2023 at 6pm -11pmDear polybox users
On July 4th 2023 at 6pm we will upgrade the polybox software to a new release. The polybox sync service will be interrupted during the change for about 2-3 hours.
Thank you for your understanding.
Best Regards,
polybox Team
Gianluca Caratsch, Urs Gubler and Tilo Steiger |